The Forth Bridge during re-furbishment. As can bee seen from the photograph an enormous amount of scaffolding is required to encase each section of the structure as work progresses. This is encapsulated to minimise pollution. The umbilical seen dropping to the water is a chute for loading rubbish direct to a tender ship.

.